Useful And Essential Facts About South Hill VA Modular Homes

By Anthony Jones


Modular homes are the kind of homes that are built in a factory setting in modules. Each module is constructed separately and independently before all the modules are joined together to form a single structure. The quality control department of the company that is doing the building usually inspects the process of production carefully to ensure standards are followed. Thus, in the end all modules meet the same quality standards. Here are facts regarding South Hill VA modular homes.

Unlike traditionally constructed homes, modular homes are not affected by weather elements. As such, unfavorable weather does not interfere with the process of constructing these homes. This leads to faster production of these houses. The construction process can still take place at night by having a nightshift crew working at night. This also contributes to faster production.

A number of factors like bad weather usually affect construction of normal houses. For instance, the construction process has to be stopped when a storm comes. In addition, most normal houses are constructed from morning hours to evening hours after which the crew leaves the site and resumes work the following day. This makes the construction process to take longer. As such, several months may be required to construct a single home.

The ease of constructing modular houses is making many people to shift to these kinds of houses. It takes an average of four weeks to produce a module. The constructed modules are protected against weather elements using a special material when they are being transported to the site of installation. Trucks are used for the transportation from the factory to the site of consumption..

The foundation in the area of installation is normally made in advance. Modules are installed one by one onto the foundation. A crane is used to offload them from a truck on which they are transported onto the foundation. The cranes install the modules in position onto the foundation.

Although the average time it takes to construct these structures is four weeks, the duration can vary a lot. The duration is affected by several factors such as the design of the structure. Complicated designs usually take longer because there is a lot of planning and designing involved in their production. Also, the size of the structure will matter because those that have more modules need more time to produce.

The installation process itself usually requires additional time to complete. The installation can be done by local builders or the production company. Most production companies prefer to do the installation themselves but the choice usually lies with the client. The client can choose whether to have the company do the installation or if they want to hire an outside contractor.

People should understand that there is a big difference between mobile and modular houses. One difference is that modular homes cannot be moved from one place to another as is the case with mobile homes. Modular houses are not mobile because the installation is done on a permanent foundation, which prevents them from moving.