If you have made plans to build a house or structure, you must apply for permits. Permits give you the legal permission to begin the construction project in accordance with the approved specifications and drawings. Construction permits are required whenever you are thinking of constructing, altering, enlarging, repairing, improving, removing, converting, or demolishing any structure or construction. This is one of the most intimidating aspects of constructing a house. To help you through this procedure, the article outlines some simple steps that you need to follow during the Albuquerque building permit application process.

You should begin by contacting the local government department in charge of construction projects. You will be required to provide a description of the work that you want to do. If the project requires permits, you will be given a form that outlines all the requirements for applying for the permits. The form must be completely filled and signed before being submitted to the department.

After you have completed these forms, you need to submit it together with other relevant documents. For the new projects, you might be asked to submit plans and drawings showing the details of the project that you are thinking of constructing. For existing projects that require remodeling or demolition, you will submit the plan that outlines the changes that you will make. There is a fee that needs to be paid as you submit these documents.

The successful submission of all the required project documents marks the beginning of the review process. This process usually takes some time. Depending on the type of construction project that you are undertaking, the review may be performed by several documents. This is important in ensuring that the construction project complies with mechanical, zoning, and fire prevention codes.

If the plans satisfy all the local requirements, you will be notified that they have been approved. If not, the officials will provide you with a list of the necessary corrections that need to be made for the review process to be successful. After making the necessary corrections, you will be required to resubmit copies of the revised plans. The recheck of the plans requires less processing time and you will be notified if the plans have been approved.

As soon as this process is completed, you will be issued with permits. This essential means that you should begin working on the construction project. The local department will conduct regular inspections on the project site to ensure that it continues to confirm to the submitted plans and local codes. There will be a regular inspection of the work in progress and inspection records will be issued during each inspection. In the subsequent inspections, the local government inspectors will require you to display the permits, inspection card, and approved plans.

After the construction project is completed, you will no longer be required to display the construction permits on your project. The local officials will perform the final review to determine if the entire project has complied with the local codes. You will be provided with a document to show that the construction project meets the safety standards.

The process of applying for construction permits does not have to be daunting anymore. You can follow the above simple steps and you will be issued with the permits within no time.